Running Foot — home

Quantity · Ready-mix order

Ready Mix Concrete Calculator

Convert slab dimensions to cubic yards for a ready-mix order — with waste, quarter-yard rounding, and a short-load warning before you call the plant.

Pour dimensions

Order this many yards

3.25cy

Rounded up in ¼ cy steps from 3.11 cy with waste

Raw volume
2.96 cy
With waste
3.11 cy
Area
240 sq ft

Short load: under 4 cy. Plants often add $50150. Confirm when you call.

Material only (delivered)

$473$800

Ready-mix $130200/cy + short-load surcharge. Labor and forms not included — use the cost calculator for installed totals.

Breakdown

  1. 20 × 12 × (4 ÷ 12) = 80 cu ft
  2. ÷ 27 = 2.96 cy raw
  3. × (1 + 5%) = 3.11 cy
  4. Round up to 3.25 cy

Price data updated . National US ranges from published supplier and contractor averages. Not a bid. Local quotes vary.

How ready-mix yardage is calculated

Ready-mix is sold by the cubic yard. Get the volume right first; price and labor come second.

cu ft        = length_ft × width_ft × (thickness_in ÷ 12)
cu yd        = cu ft ÷ 27
with waste   = cu yd × (1 + waste %)
order yards  = ceil(with waste × 4) ÷ 4     ← ¼ cy steps

Worked example. A 20 × 12 ft × 4 in slab is 80 cu ft → 2.96 cy. With 5% waste → 3.11 cy, rounded to 3.25 cy for the plant. That sits above the 4 cy short-load line, so you avoid the small-order surcharge — unlike a tiny pad pour.

Ready-mix order checklist

What to confirm when you phone the batch plant — the details ranking calculators usually skip.

Ask the plantTypical US note
Mix strength (psi)3000–4000 psi common for residential slabs; follow local code
Slump~4 in typical for slabs; higher for pumped mixes
Air entrainmentExterior freeze-thaw exposure usually needs entrained air
Short-load fee$50150 under ~4 cy
Delivery / wait timeExtra charges if the truck sits past the free unload window
Price per cy deliveredNational planning range $130200/cy — get a local quote

Ready mix concrete calculator FAQ

How do I calculate ready-mix concrete in cubic yards?
Multiply length × width × (thickness in inches ÷ 12) to get cubic feet, then divide by 27. Add a waste percentage (often 5%) so you do not run short mid-pour. Plants commonly take orders in quarter-yard steps — this calculator rounds up to the next 0.25 cy.
What is a short load of ready-mix?
A short load is an order under about 4 cubic yards. The plant still dispatches a truck, so many charge a $50–$150 surcharge. Combine pours on one day or use bags when the volume is tiny.
How much extra ready-mix should I order?
Five percent covers most rectangular slabs with a decent subgrade. Bumpy excavation, thick edges, or first-time pours may need closer to 10%. Running short costs more than a leftover wheelbarrow load — leftover can become a pad or pier.
When should I use bags instead of ready-mix?
Below roughly 1 cubic yard, bagged concrete (Sakrete / Quikrete) is usually cheaper and easier once short-load fees are counted. Above that, a truck saves labor. Use the bag calculator to compare.
Does this include labor to place the concrete?
No. This page sizes the truck order and shows a delivered-material range only. For installed cost with labor, rebar, and forms, open the concrete cost calculator.

Next: price the pour or switch to bags

Now estimate what this will cost → · Bag calculator · Sonotube volume